“Year after year, three years a great change” tells the true story of Nobot industrial robots over three years
Published Time:
Aug 14,2019
Many entrepreneurs have dreamt of 'opening in the first year, securing funding in the second, and going public in the third,' but only a handful have turned this dream into reality. Let's see how far Nobot has come.

2016
1、 2、3#Workshop Completion And put into use The industrial robot project was officially put into operation
April 26 Xu Jingyan, Secretary of the Liaocheng Municipal Party Committee and Director of the Standing Committee of the Municipal People's Congress To Nobot Research
April 27, participated in the 2016 Shanghai International Logistics Technology and Equipment Exhibition
June 18, Wang Zhigang, former chairman of the Municipal Committee of the Chinese People's Political Consultative Conference and director of the Liaocheng Development Research Institute, went to Nobot for research
October 21 Wang Junmin, deputy head of the Shandong Provincial Committee's Comprehensive Deepening Reform Group and former deputy secretary of the Shandong Provincial Committee Nobot research
November 7, Wu Cuiyun, member of the Standing Committee of the Provincial Committee and Minister of the United Front Work Department, came to Nobot for research
December 1, Nobot participated in the 3rd Shandong Provincial Entrepreneurship Competition, Won the first place in the enterprise group and project group of Liaocheng competition area, and the third place in the enterprise group of Shandong provincial finals.
December 19, Nobot Intelligent Equipment (Shandong) Co., Ltd. was officially listed on the Qilu Equity Exchange
December 22, the national and provincial people's congress representatives stationed in Liaocheng came to the high-tech zone for a concentrated inspection, Guo Zhaoxin, Yang Sicheng, Wang Wenyue, Sun Jing and 11 other representatives came to Nobot Intelligent Equipment (Shandong) Co., Ltd. Inspection.
2017
In February, Nobot reached a strategic partnership with ABB
June 19, Nobot Inspection and Testing Center was established
July, Nobot R&D building started construction
July 1, Cao Guoying, Deputy Director of the Ministry of Science and Technology, visited Nobot
September 1, the municipal science and technology innovation enterprise management personnel training class came to Nobot for a visit and study
September, Nobot was rated as a high-tech enterprise in Shandong Province
October, the chairman of the company was selected as the "Taishan Industrial Leading Talent" by the Shandong Provincial Organization Department and the Shandong Provincial Science and Technology Department
December, Nobot was approved as the Shandong Provincial Engineering Technology Research Center for Multi-joint Industrial Robots
2018
February, Nobot Technology Showroom was officially put into use
March 5, Zhou Chunyan, Deputy Director and member of the Party group of the Provincial Department of Human Resources and Social Security, led a research team to Liaocheng High-tech Zone to investigate the introduction and training of talents, and went deep into Nobot Intelligent Equipment (Shandong) Co., Ltd. to understand the relevant situation.
April 1, the China Robot Summit officially released the first batch of 20 lists, and Nobot won the domestic "Top 100" robot system integrators
On the morning of April 26, Yue Lingyun and Guo Yong, deputy general managers of Nobot Intelligent Equipment (Shandong) Co., Ltd., signed a cooperation agreement on industry-university-research cooperation and joint cultivation of talents with the School of Mechanical and Automotive Engineering of Liaocheng University on behalf of the company.
May 5, Nobot R&D building topped out
June 6, Nobot and Liaocheng Technician College jointly established Nobot Intelligent Manufacturing College
June 23, Nobot participated in the 2018 Shandong (Jinan) High-end Seminar on Trademark and Brand Strategy for Promoting Major Projects of Transforming Old and New Kinetic Energy
July 5, Nobot Intelligent Equipment (Shandong) Co., Ltd. was invited to participate in the second talent and science and technology innovation conference of the high-tech zone, and many comrades from Nobot were selected as the "3111" talents of Liaocheng High-tech Zone.
September 1, Qin Cunhua, member of the Standing Committee of the Municipal Party Committee, Minister of the United Front Work Department, and chairman of the Municipal Federation of Returned Overseas Chinese, led a delegation of the Federation of Returned Overseas Chinese to visit Nobot Intelligent Equipment (Shandong) Co., Ltd. for inspection.
September 9, Liaocheng Technician College - Nobot Intelligent Manufacturing College welcomed the 2018 freshmen. The first freshmen of industrial robot application and maintenance major were successfully enrolled.
On the morning of November 12, Nobot Intelligent Equipment (Shandong) Co., Ltd. signed a "Workstation Cooperation Agreement" with Wang Zicai, an academician of the Chinese Academy of Engineering, vice president of the Chinese Society of Systems Simulation, and professor of Harbin Institute of Technology.
November 20, Song Shaoshan, director of Liaocheng National Taxation Bureau, and Shen Dehe, director of the Development Zone Branch, visited our company for inspection
November 22, Yu Xiaoming, secretary of the Party group and vice chairman of the Standing Committee of the Provincial People's Congress, led a team to visit Nobot for research
2019
February, Nobot won the 2018 China Annual Influential Brand
On the morning of February 22, Yin Yanbo, head of the second department of the Shandong branch of the State Development Bank, and his team came to Nobot Intelligent Equipment (Shandong) Co., Ltd. for key research
April 1, Nobot reached a strategic partnership with OMRON
April , Nuo Yan Xinhua, chairman of Norbert Industrial Robot, was awarded the "Shandong Youth May 4th Medal" by the Communist Youth League Committee of Shandong Province and the Shandong Youth Federation
May 13 morning , Liu Jiayi, secretary of the Shandong Provincial Committee, led a visiting group to visit the Nobot industrial robot project
June 27, the unveiling ceremony of the academician workstation of Nobot Intelligent Equipment (Shandong) Co., Ltd. was grandly held in Nobot Industrial Park

BLOGS
Nobot Group's 2025 Kick-off Event: A Team Building Activity Focused on Unity and Power
This opening ceremony was both a knowledge-boosting session, allowing employees to continuously grow through learning, and a team-building event, bringing everyone closer together. It impressed upon each employee that in today's increasingly competitive market, only by continuously learning new knowledge, daring to innovate, and maintaining teamwork can we remain undefeated. With the collective efforts of all employees, Nobot will surely ride the waves and achieve even greater success on this new journey, steadily advancing towards higher goals!
Nobot was invited to attend the Belt and Road International Exchange Conference
On July 28, 2024, the 2024 Liaocheng "Belt and Road" International Exchange Conference and the Unveiling Ceremony of the Central Asia International High-end Talent Joint Training Base were held in the Liaocheng High-tech Zone University Science and Technology Park. Professor Tursunbayev Zaporotot, President of Osh Technological University of the Kyrgyz Republic and corresponding academician of the Kyrgyz Academy of Engineering, and Academician Smaylor Erta of the Kyrgyz Academy of Engineering and the Russian Academy of Natural Sciences, among other experts and scholars from "Belt and Road" countries, participated in the event. Liaocheng Deputy Mayor Wang Gang and Zhang Ya, Party Secretary and Director of the Management Committee of the High-tech Zone, attended the event and delivered speeches.
This training event not only provided a valuable learning opportunity for company managers and key personnel, but also built a platform for communication and sharing. During the training, everyone actively interacted and discussed enthusiastically, exploring effective ways to improve management capabilities together. Through this training, everyone has gained rich knowledge and skills, but more importantly, it has inspired confidence and motivation for the future.
How to use a five-axis machining center efficiently? Today, let's learn a few practical steps!
When using a five-axis machining center, the equipment must first be adjusted to ensure that the workpiece and fixture dimensions precisely match, and that the zero points of each axis are accurately adjusted.
Why do composite materials require 5-axis CNC machining?
Composite materials are widely used in various fields such as aerospace, automotive, construction, energy, energy storage, infrastructure, marine, pipelines and tanks, sports and entertainment, and transportation due to their light weight, high fatigue resistance, and strong fracture resistance. Among them, aerospace and automotive industries are the largest application markets for composite materials. Five-axis CNC plays an important role in the processing of composite materials. Why do composite materials need to be processed using five-axis CNC?
Dual-station five-axis machines offer several significant advantages. First, while one station is being machined, the other can be used for material loading and unloading, ensuring continuous, non-stop machining and significantly improving production efficiency. Second, the dual-station design makes operation more convenient and reduces waiting time. However, dual-station five-axis machines typically cost more than single-station machines and may require more operating and maintenance space.